skip to Main Content

Thanks to a recent bond issue, Lowell School District was able to renovate both its Elementary and High School. Integrated was awarded one of the larger scopes of the remodel, the technology divisions. Integrated provided some much-needed upgrades to this 90-year-old school; including new fire alarm, new intrusion alarm, voice and data cabling, new intercom clock system, card access and surveillance cameras.

Most of this work was performed over the summer break, creating the usual school tight timeline. Integrated completed nearly all of the critical work with all systems up and running, prior to the students return in September.

This project is now continuing as we complete the same tasks in the new Gym and Wrestling Room additions.

PRODUCTS INCLUDED

  • Valcom school intercom and clock system
  • Honeywell fire alarm
  • Bosch intrusion system
  • Leviton certified cabling infrastructure
  • S2 Access control